Beschreibung
Es steht keine Beschreibung zur Verfügung.
auch gefragt...
F. Please indicate the condition of the catch basin.
A. Clogged/Flooding
A. Clogged/Flooding
F. Please provide any additional information about the catch basin issue to assist Town employees in remediating the situation.
A. Rosemary Brook is clogged and in desperate need of dredging, it is classified as a Class 5 water way. the water is no allowed to flood the area killing trees and has turned the land into a swamp.
A. Rosemary Brook is clogged and in desperate need of dredging, it is classified as a Class 5 water way. the water is no allowed to flood the area killing trees and has turned the land into a swamp.
7 Kommentierens
Rana M. (Registrierter Benutzer)
John Whalen III (Registrierter Benutzer)
Rana M. (Registrierter Benutzer)
Rana M. (Registrierter Benutzer)
Rana M. (Registrierter Benutzer)
Rana M. (Registrierter Benutzer)
John Whalen III (Registrierter Benutzer)