Description
The roadway on Baldwin Ave between Montgomery St and and Clifton needs the pedestrian crossing marks repainted. The old lines are not clear to motorists. One of the "stop while pedestrians are crossing" posts would also be helpful. This stretch of road is very long and cars zoom by.
also asked...
Q. Please select the issue:
A. 3. Traffic: Roadway Striping Maintenance (For all requests to refresh faded roadway striping, including crosswalks, double yellow centerlines, stop bars and markings, lane arrows, etc. Requests are typically addressed within 3 to 6 months.
A. 3. Traffic: Roadway Striping Maintenance (For all requests to refresh faded roadway striping, including crosswalks, double yellow centerlines, stop bars and markings, lane arrows, etc. Requests are typically addressed within 3 to 6 months.
Q. Additional Information
A. No Answer Given
A. No Answer Given
5 Comments
RRC <small class="fwn">(Verified Official)</small>
Acknowledged Traffic – Jennifer C (Verified Official)
If you have any further questions, please call Resident Response Center at (201) 547-4900.
Traffic – Jennifer C (Verified Official)
Traffic – Jennifer C (Verified Official)
Closed Traffic – Jennifer C (Verified Official)