Description
The roadway on Baldwin Ave between Montgomery St and and Clifton needs the pedestrian crossing marks repainted. The old lines are not clear to motorists. One of the "stop while pedestrians are crossing" posts would also be helpful. This stretch of road is very long and cars zoom by.
a aussi demandé...
Q. Please select the issue:
A. 3. Traffic: Roadway Striping Maintenance (For all requests to refresh faded roadway striping, including crosswalks, double yellow centerlines, stop bars and markings, lane arrows, etc. Requests are typically addressed within 3 to 6 months.
A. 3. Traffic: Roadway Striping Maintenance (For all requests to refresh faded roadway striping, including crosswalks, double yellow centerlines, stop bars and markings, lane arrows, etc. Requests are typically addressed within 3 to 6 months.
Q. Additional Information
A. No Answer Given
A. No Answer Given
5 Commentaires
RRC <small class="fwn">(Membre officiel vérifié)</small>
Reconnu Traffic – Jennifer C (Membre officiel vérifié)
If you have any further questions, please call Resident Response Center at (201) 547-4900.
Traffic – Jennifer C (Membre officiel vérifié)
Traffic – Jennifer C (Membre officiel vérifié)
Clos Traffic – Jennifer C (Membre officiel vérifié)