Description
Street construction was done in September 2019 and although temporary patches were put in place, the road has not been repaved since, and is in bad shape.
Street construction was done in September 2019 and although temporary patches were put in place, the road has not been repaved since, and is in bad shape.
3 Comments
Acknowledged Boston Open311 (Verified Official)
Boston Open311 (Verified Official)
Closed Boston Open311 (Verified Official)
Your service request (#101003298117) has been closed.
Notes: Case Resolved. Dear Constituent,. The Boston Public Works Construction Inspection Unit (CIU) Inspector investigated and determined the following:. The utility work is actually in pretty good shape. Its the roadway that needs resurfacing. Recommend you call 311 back and ask that the case be allocated to our roadway repair queue to be inspected by our engineers to possible add to a future paving program. For any questions or concerns, please contact the number listed below. Sincerely,. Mark Cardarelli. Supervisor of Utility Coordination and Compliance. Boston Public Works Department. 617-635-4951 Office.