Description
Road has been ripped up for construction multiple times. Many potholes and bumps in road. Is beaver st due to be paved soon?
Road has been ripped up for construction multiple times. Many potholes and bumps in road. Is beaver st due to be paved soon?
5 Comments
Hamden, CT (Verified Official)
Staff Engineer (Verified Official)
Hamden, CT (Verified Official)
Closed Staff Engineer (Verified Official)
The road is scheduled to be disturbed two more times.
1. To replace the existing storm drainage with a larger system.
2. SCG will be replacing the gas main in the street as part of their global upgrade plan.
Once both of these projects are completed, we will schedule a repaving of the roadway.
BMenewitch (Registered User)