Descrição
Both sides of the street are blocked for pedestrians due to construction. This is a big problem for people walking and ADA.
Both sides of the street are blocked for pedestrians due to construction. This is a big problem for people walking and ADA.
14 Comentários
City of Cambridge (Oficial Verificado)
Nico (Utilizador Registado)
Public Works - TS (Streets & Sewers) (Oficial Verificado)
Reconhecida Public Works - PA (Inspections) (Oficial Verificado)
Public Works - PA (Inspections) (Oficial Verificado)
Public Works - PA (Inspections) (Oficial Verificado)
afo3666 (Utilizador Registado)
Batman (Utilizador Registado)
Batman (Utilizador Registado)
Public Works - PA (Inspections) (Oficial Verificado)
-contractor install new sidewalks and ada pads on Plymouth at Berkshire and temp asphalt on Vandine at Berkshire. All work should be complete this week.
Encerradas Public Works - PA (Inspections) (Oficial Verificado)
afo3666 (Utilizador Registado)
afo3666 (Utilizador Registado)
afo3666 (Utilizador Registado)