Opis
Future wheelchair ramp work, road resurfacing and paving planned for September 2020.
Limits of work: Henry Street to Ferry Street
Future wheelchair ramp work, road resurfacing and paving planned for September 2020.
Limits of work: Henry Street to Ferry Street
5 Skomentujs
Malden, MA (Verified Official)
Yem Lip (Director of Engineering) (Verified Official)
Yem Lip (Director of Engineering) (Verified Official)
Yem Lip (Director of Engineering) (Verified Official)
Zamknięte Yem Lip (Director of Engineering) (Verified Official)