الوصف
From the 202 south to Ray rd, why has the paving of the North and Southlanes stopped, it has been a few weeks now and it is not being finished, the final asphalt and the curbs need to be done, is there a reason why it is taking so long No one has been working on it for awhile?
7 تعليقs
Gilbert 311 (تم التحقق رسميا)
Seeing All (مستخدم مسجل)
مغلق Nameless (مستخدم مسجل)
Christie (مستخدم مسجل)
Copper Ranch Resident (مستخدم مسجل)
Engineering - Betty 🚦 (مستخدم مسجل)
Copper Ranch Resident (مستخدم مسجل)