Beschreibung
While the Recker road widening project is on hold/out for rebid, can someone from the town walk the sidewalk on the east side of Recker between Ray Rd and the freeway trail. I counted more than 20 significant sidewalk heaves in that section. It would be great if these could be addressed while everything is torn up.
5 Kommentierens
Gilbert 311 (Verifizierter Beamter)
Engineering - Debbie 🚦 (Verifizierter Beamter)
Gilbert 311 (Verifizierter Beamter)
BillAndJulie (Registrierter Benutzer)
Geschlossen Engineering - Ryan (Verifizierter Beamter)