Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
All areas along Circular Avenue have been reviewed by Engineering from 70 Circular Avenue up to 710 Circular Avenue. Several areas on both sides of Circular Avenue are scheduled to be replaced this fiscal year. MGK