Description
Right turn only portion of BOTH signs on NB Greene at Second have been defaced leading to possible confusion. EVERY LIGHT CYCLE at least one motorist goes straight through in right lane and must merge abruptly to avoid bike lane pylons
also asked...
Q. Please select the issue:
A. 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
A. 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
Q. Additional Information
A. No Answer Given
A. No Answer Given
4 Comments
Jersey City, NJ (Verified Official)
Acknowledged Traffic – Jennifer C (Verified Official)
cyclistjoe (Registered User)
Closed Engineering - Althea (Verified Official)