Hillside Ave Chatham, NJ, 07928, USA
Hello,
This fall and early winter, DPW has re-paved Overlook, and several other low-traffic side streets off Hillside Avenue (between Main Street and Watchung). DPW has also re-paved Hillside Avenue, but only south of Watchung Ave. and up towards the cemetery. This areas also has less traffic.
However, none of Hillside Avenue between Main Street and Watchung has been re-paved following the installation of the new gas line, and this stretch is by far the most traveled section of the street. It still has numerous holes, bumps and the lengthy stretch of replacement concrete from the work.
When exactly will Hillside Avenue between Main Street and Watchung be re-paved, similar to what was done to most of the less trafficked, side streets?
Thank you.