BKW

  • Pothole La qiray
    2 Crowley Rogers Way Boston MA 02127, United States - South Boston
    1 foot deep pothole
  • Pothole La Kaydiiyey
    178 W 4th St Boston 02127, United States - South Boston
    Pothole on the crosswalk at the intersection of B and West 4th street. This was repaired about 3 years ago but keeps sinking in further and further. A large woman of especially unique physical dimension got her wheel chair stuck in this thing about a week ago and it took a Herculean effort to assist her carriage out of the hole. Traffic was held up for quite some time.
  • Pothole La Kaydiiyey
    173 W 4th St Boston 02127, United States - South Boston
  • Streetlight La Kaydiiyey
    182-198 West 4th Street Boston, MA 02127, USA - South Boston
    Exposed electrical wire
  • Streetlight La Kaydiiyey
    165-179 West 4th Street Boston, MA 02127, USA - South Boston
    Top of streetlight as been knocked off.
  • Other La Kaydiiyey
    150 West 4th Street Boston, MA 02127, USA - South Boston
    Damaged fire hydrant
  • 18 A St Boston, MA 02127, USA - South Boston
    The scrap metal shop on B street is not cleaning up after their work. They leave sharp metal and other debris from their business for dogs to walk over an cars to drive over. If the city isn't going to enforce that this business operates within acceptable standards then they should clean up after them. This is a very busy traffic and pedestrian intersection ad needs to be clear of sharp metal debris.
  • Garbage Collection La Kaydiiyey
    135 B Street Boston, MA - South Boston
    The public works department recently installed a metal garbage can on the sidewalk at the corner of B Street and Bolton Street adjacent to the park. However, it is not being picked up and is overflowing with trash. Please add this location to the the Public Work's spots for trash removal.
  • 165-179 W 4th St Boston, MA 02127, USA - South Boston
    There are large potholes on both sides of the bridge going over the Bypass road. There was an earlier attempt this year to do a quick and dirty patch job but the warmer than average temperatures in the day and cold nights have cause the constant expansion/contraction of this area on the road bordering the bridge causing the patch job to quickly erode. Please fix this for a more permanent solution.