Flyerker

  • Shoulder Concern Inilagay sa Artsibo
    Us-23 N Ann Arbor MI 48105, United States - Washtenaw County
    Large potholes in the lane seams and at beginning of the exit ramp on the northbound US23
  • Pothole (Paved Roads) Inilagay sa Artsibo
    5562 Spring Hill Dr Ann Arbor MI 48105, United States - Washtenaw County
    About 1/4 mile of large potholes
  • Shoulder Concern Inilagay sa Artsibo
    Plymouth Rd Ann Arbor MI 48105, United States - Washtenaw County
    Intersection of M153 and Plymouth Rd (all directions )- needs signage "complete left turn when cross traffic clears"
  • Other issue Kinilala
    2150 Jackson Ave Ann Arbor MI 48103, United States - Ann Arbor
    There is only 1 handicap parking spot available at Veterans Park near the baseball fields - many times on nice evenings at least 3 are needed
  • Traffic Signal Timing Concern Inilagay sa Artsibo
    4501–4525 Plymouth-Ann Arbor Rd Ann Arbor MI 48105, United States - Washtenaw County
    Signal stopped Plymouth traffic at 7:30 pm with NO cross on Whitehall
  • Traffic Signal Timing Concern Inilagay sa Artsibo
    4472–4498 Plymouth-Ann Arbor Rd Ann Arbor MI 48105, United States - Washtenaw County
    It make NO sense for this signal to stop Plymouth traffic when there is NO cross traffic especially at 8:30pm on a Sunday ,
  • Signal repair Inilagay sa Artsibo
    901–913 Maiden Ln Ann Arbor MI 48105, United States - Ann Arbor
    Why is there no turn on red here when there are no conflicts ??
  • Traffic Signal Timing Concern Inilagay sa Artsibo
    4220 Plymouth-Ann Arbor Rd Ann Arbor 48105, United States - Washtenaw County
    This traffic light always goes through ALL possible parts of the cycle even when there are NO cars waiting for many of the elements of the cycle. This causes unnecessary delays and vehicle idling wasting time and resources.
  • Pothole (Paved Roads) Inilagay sa Artsibo
    5661 Tanglewood Dr Ann Arbor 48105, United States - Washtenaw County
    Tanglewood Drive was recently resurfaced in various locations but that left a 3-4 inch “drop off” in front of the mailbox clusters which causes low ground clearance cars to scrap bottom if they attempt to drive on the shoulder. A truck load of gravel is needed to bring the shoulders up to the level of the new road surface at each if the mailbox clusters.
  • Pothole repair Inilagay sa Artsibo
    1345 N University Ct Ann Arbor 48109, United States - Ann Arbor
    Total street disintegration on the eastbound side down to the gravel base
  • 1764–1798 Murfin Ave Ann Arbor 48105, United States - Ann Arbor
    Muffin southbound side 75 feet south from Plymouth
  • Pothole (Paved Roads) Inilagay sa Artsibo
    1930 Hogback Rd Ann Arbor 48105, United States - Washtenaw County
    Numerous large potholes in BOTH directions from Clark to Huron river drive.
  • Pothole (Paved Roads) Inilagay sa Artsibo
    4179–4249 E Huron River Dr Ann Arbor 48105, United States - Washtenaw County
    Numerous large potholes in BOTH directions are between Hogback and old Dixboro road.
  • Signal repair Inilagay sa Artsibo
    1758–1762 Plymouth Rd Ann Arbor 48105, United States - Ann Arbor
    Signal on EB Plymouth at Murfin at 8:30pm is only letting 3-4 cars through at a time (cycle is too short) when over 12 cars are waiting to get through.
  • Pothole repair Inilagay sa Artsibo
    1340 N University Ct Ann Arbor 48104, United States - Ann Arbor
    The eastbound side of N University Ct is totally disintegrated. There are potholes 10 feet long by 4 feet wide and the gravel base is coming through.
  • Pothole repair Inilagay sa Artsibo
    3773–3799 Plymouth Rd Ann Arbor 48105, United States - Ann Arbor
    The seams between the asphalt lanes have totally disintegrated in BOTH DIRECTIONS on the approaches to the bridge over US23 leaving many large deep potholes. The seams need to be cut out 1-2 feet wide, dugout and filled with continuous rolled hot mix patch (similar to work done on Huron Parkway recently). The current cold patching approach is NOT WORKING.
  • Pothole Inilagay sa Artsibo
    3800–3828 Plymouth Rd Ann Arbor 48105, United States - Washtenaw County
    The seams between the asphalt lanes have totally disintegrated in BOTH DIRECTIONS on the approaches to the bridge over US23. The seams need to be cut out 1-2 feet wide, dug out and patched in a continuous hot mix rolled patch (the current cold patching approach is NOT WORKING).
  • Pothole Inilagay sa Artsibo
    5604 Tanglewood Dr Ann Arbor 48105, United States - Washtenaw County
    Several large potholes on Tanglewood Drive between the new repaved sections of road
  • Other issue Inilagay sa Artsibo
    601 E Hoover Ave Ann Arbor 48104, United States - Ann Arbor
    A formally marked cross walk is needed because many people cross Hoover in front of the IM building.
  • Pothole repair Inilagay sa Artsibo
    I-94 Bus W Ann Arbor 48108, United States - Ann Arbor
    There are many potholes in the asphalt lane seams from I-94 to Geddies Rd on US-23 NB