Tim Y

  • 633 8th St New Westminster, BC V3M 3S4, Canada - New Westminster
    The bike lane at the corner on the south side is full of leaves inches thick.
  • Queensborough Connector New Westminster, British Columbia - New Westminster

    The bridge sidewalk is really narrow, especially the last 100m at the south end which narrows to 1.5m wide and has a blind corner. I had a near miss with another cyclist that lost control coming down the bridge after passing me and injured her hand on the bridge railing. The sidewalk starts curving here an narrows down from 1.8m to 1.5m. The downhill speeds allows cyclists to easily reach speeds of 30-40 kph while entering this narrow section with reduced visibility. This section is very dangerous as a result. Can the sidewalk be widened here? Can the sidewalk be widened onto the roadway which has a shoulder at this point?
    Google Streetview:
    https://www.google.ca/maps/@49.1922078,-122.9429115,3a,53.6y,338.49h,81.46t/data=!3m6!1e1!3m4!1sZ9U7Bby2-YPK9QLi8WutmQ!2e0!7i13312!8i6656

    The sidewalk is too narrow considering the volume of pedestrians and cyclists!

  • 350 Gifford Street New Westminster, British Columbia - New Westminster

    Cyclist tires can get stuck in the catch basin as mine did. Cyclists typically ride across crosswalks, especially on Multi-use trails. Cyclists are looking out for traffic and not looking at the road surface at this location. I have rode across this location many times on the trail and never noticed that catch basin and my tire got partially stuck in it at a low speed.

    The grate is poorly located. Can a different grate be installed here? http://dandyhorsemagazine.com/wp-content/uploads/2013/12/great_good-new-grate-848x1024.jpg

  • Road Surface Issue Acknowledged
    8071-8175 140 Street Surrey, British Columbia - Surrey
    Pothole in the centre of the bike lane northbound on the concrete bridge over Bear Creek. Could cause serious injury to cyclists if it grows in size as cyclists are typically going quite fast as the location is at the lowest point after a very long steep hill.
  • 7635 King George Highway Surrey, British Columbia - Surrey
    Pedestrian signal for eastbound on north side of 76 Ave does not activate a signal
  • 9944 120 Street Surrey, British Columbia - Surrey
    The pathway needs to be swept. When I rode on it on Dec 24 it was covered in slippery leaves. This is a steep path and a cyclist going downhill could easily lock up the brakes and fall as a result
  • 7533 135 Street Surrey, British Columbia - Surrey
    There are 2 potholes here in the eastbound direction. The one in the bike lane has caught me 2x when I am riding at night. Please fix ASAP.
  • 14191 108 Avenue Surrey, British Columbia - Surrey
    I have tried crossing at this location before and I was not alone when I tried crossing as there were other people trying to cross at this location. This street is very difficult to cross as there are 4 lanes and no median. There are bus stops on either side of the street. Drivers do not stop for pedestrians either. It is a dangerous intersection without any pedestrian controlled light.
  • 8536-8648 140 Street Surrey, British Columbia - Surrey
    Between parking lot and 84th Ave and by bus stop near seniors apartments further south along west multi-use path
  • 8536-8648 140 Street Surrey, British Columbia - Surrey
    Between parking lot and 84th Ave and by bus stop near seniors apartments further south
  • 7660 18th Street Burnaby, British Columbia - Burnaby
    The pathway to the bridge is covered in cut vegetation after a crew comes to this area. The vegetation left on the trail contains blackberry thorns which can go into bike tires and cause flats. I had many of these in my lifetime.
    Why is this pathway not swept or blown off with a leaf blower after the brush cutting. Do Burnaby crews now own this equipment? The work here is very sloppy.
  • 9349-9407 140 Street Surrey, BC V3V 5Z4, Canada - Surrey
    Dangerous crossing. Bushes need to be removed. I can not see vehicles approaching prior to crossing. Vehicles will not stop for pedestrians or cyclists if drivers can not see them. Remove shrubs!!!
  • Serpentine Greenway Surrey, British Columbia - Surrey
    There is a broken CRT Tube in the blackberries, There is also melted shopping card debris on the path.
  • 14001-14115 75 Avenue Surrey, British Columbia - Surrey
  • 13415-13429 76 Avenue Surrey, British Columbia - Surrey
    A few pounds of lag screws were dumped in the bike lane at the bus stop on the north side (westbound). The entire street between 132 St and King George should be swept as the screws were seen spread along the corridor.
  • Missing Bollard Acknowledged
    Bc Parkway Surrey, British Columbia - Surrey
    The bollard is missing and it is currently a hazard in low light conditions as cyclists may not see the 2-3 inch high bollard base post.
  • Bc Parkway Surrey, British Columbia - Surrey
    Overgrown vegetation, litter dumping as well
  • 7600 140 Street Surrey, BC - Surrey
  • 7524 140 Street Surrey, BC - Surrey
    between 7500 and 7600 blocks
  • 13028-13078 Linton Way Surrey, BC V3W 5W6, Canada - Surrey

    13066 Linton way

    it has been like this for a number of weeks