Jim Holway

القضايا المفتوحة: 286 اصدارا: 24,332 قضايا المعترف: 1,459
Watching issues created after: 2013-07-03

New North End NPA Steering Committee

إخطار عن

  • 279 North Winooski Avenue Burlington, Vermont - Burlington Electric
    This sort of sloppy work should never be tolerated in a city that prioritizes safety. The bike lanes are currently unsafe because of faded striping and inadequate signage. Let's get it right this year or replace the folks who keep getting it wrong.
  • Other Archived
    Burlington Burlington, Vermont - Burlington Electric
    As the Director of DPW, Can Chapin Spencer please explain DPW's recent handling of SCF issues. DPW has recently taken it upon themselves to close issues prior to be resolved because the reporting user is not giving contact information. This will undermine the usefulness of SCF, remove anonymity and transparency. Thank you.
  • 21 South Willard Burlington, Vermont - Burlington Electric
    A safe pedestrian detour would be extremely easy to design and implement here. Instead a complete blockage has been maintained for weeks. There is currently no signage whatsoever at the nearby corners. Children are literally squeezing between the construction dumpster and Rte. 7 traffic. Public Works, where are you on this?
  • Island Line Trail Burlington, VT 05401, USA - Burlington Electric
    Yet another needless bike path closure the kind of which the realignment was meant to prevent...
  • 275 Flynn Ave Burlington, VT - Burlington Electric
    It's near impossible to cross the street here safely. With the increase in traffic on the way it really needs a crosswalk. The sidewalk already appears ready for it with the yellow textured ends. Can DPW spare a little paint?
  • 280 Colchester Ave Burlington, VT, 05401, USA - Burlington Electric
    Large pothole/sinkhole in bike lane by Hospital entrance. Real hazard to people on bikes. Also, please sweep this area as there is a large amount of debris in the roadway as can be seen in the picture. Bike lane markings are worn away in most places and are in urgent need of repainting as can be seen in the picture.
  • Island Line Rail Trail Burlington, Vermont - Burlington Electric
    Growing encampment North of Blodgett's just off bike path. Are we now waiting for another incident to occur?
  • Other Archived
    268 S Winooski Ave Burlington, VT 05401, USA - Burlington Electric
    big honking sign dangerously blocking bike lane and obstructing travel lane to tell drivers what they should already know and be doing 🙄🙄🙄
  • 408 Colchester Ave Burlington, VT 05401, USA - Burlington Electric
    When weather permits, please sweep the uphill side of Colchester Ave (top to bottom). There is currently 4 feet of soil, gravel, and trash from the curb into the road. Additionally, there are blocked drains.
  • Cycling enforcement Acknowledged
    North Ave Burlington Vermont - Burlington Electric
    Wrong way cyclist on North Ave. Witnessed a car attempting to turn left on North Ave slam on their brakes and almost get rear ended due to a cyclist traveling the wrong way. Both traveling North. Why cant anything be done?
  • Sidewalks Archived
    445 South Union Street Burlington, VT 05401, USA - Burlington Electric
  • Ethan Allen Homestead Burlington, Vermont - Burlington Electric
    The wooden arch bridge spanning VT 127 links Ethan Allen Homestead to the neighborhoods and Ethan Allen Park on the other side. It has been blocked off with chainlink fence and not maintained for several years. From what I have read, over $250,000 was spent to build this structure in the 1980's. Considering it's aesthetic and actual value, it should be maintained.