Jim Holway

Offene Fälle: 178 Geschlossene Fälle: 23.160 Anerkannte Fälle: 1.312
Fälle beobachten, die erstellt wurden nach: 2013-07-03

New North End NPA Steering Committee

Benachrichtigt über

  • 80 Cherry Ln Burlington, Vermont - Burlington Electric
    Please repair the paved path between Callahan Park and the Birchcliff Parkway neighborhood. The pavement is in terrible condition. Pedestrians (many of them children!) are tripping and falling. We need a pedestrian- and bike-friendly path between the Five Sisters neighborhood and Champlain Elementary School. Thank you.
  • 174 Home Ave Burlington, VT, 05401, USA - Burlington Electric

    I do not know what the city can do other than build the Champlain Parkway finally after 4 decades, but until then if something is not done to deal with the constant speeding traffic and massive tractor trailer trucks that cascade down Home Ave at all hours of the day, someone is going to get seriously hurt or worse. Kids are scared to walk out of their front doors or walk to school because it is like playing a game of frogger every morning and afternoon at rush hour.

    Why is the city and state so dysfunctional? Why can't they bring any large infrastructure project successfully to fruition?

  • Parking lines Archived
    North Winooski Ave Burlington, Vermont - Burlington Electric
    Can DPW paint Parking lines on North Winooski Ave?
  • 311-327 Pine Street Burlington, Vermont - Burlington Electric

    Bike lanes city wide are lousy with a winter's worth of gravel, silt, litter and other debris which pose loss of control hazards and crash hazards.

    Streets with significant pothole issues, e.g. Pine St and North Ave, are significantly worse as all the pothole debris gets pushed into the bike lanes. In some areas this has formed gravel mounds that are inches high.

  • Graffiti Acknowledged
    187 Pearl St Burlington, VT, 05401, USA - Burlington Electric
    This corner is starting to look like a ghetto. Graffiti on multiple posts of Asiana House's awning structure. Also large tags on brick building to west of Asiana house.
  • 8 North Winooski Avenue Burlington, VT - Burlington Electric
  • 70 Cherry Street Burlington, Vermont - Burlington Electric
    After being told the problem was being rectified by Chapin Spencer, today there are 2 CCTA cars parked at meters UNPAID and 2 buses at the intersection of Cherry and Pine. 1 bus is at a meter unpaid and 1 parked in a no parking zone.
  • North Union Street Burlington, Vermont - Burlington Electric
    the obstacles scattered all along north union street to delineate the bike lane pose Major hazards for motorcyclist. why are bicycle riders safety ahead of others in danger? Motorcyclists are people too.....if evasive action needs to be taken, a Motorcyclist will be hurt terribly, a bicycle rider can just bail off without a 500lb object landing om them...
  • 140-150 Pearl St Burlington, VT 05401, USA - Burlington Electric
    Please clear the bike lane on Pearl Street, it is covered with dirt and sharpes, it is not usable.
  • 165-189 Colchester Ave Burlington, VT 05401, USA - Burlington Electric
    Please clear the bike lane on Colchester Ave, it is covered in a thick coating of dirt, the arrows are invisible.
  • Snow Plowing Archived
    298 S Winooski Ave Burlington, VT, 05401, USA - Burlington Electric
    Northbound bike lane is reduced to foot-wide section. Bikes are forced to drive on double yellow against traffic.
    Note: Sending a sidewalk plow down the bike lane at this stage is way too late and will achieve very little, because of the amount of snow and ice. This needs a big plow and should have been addressed during the parking ban(s).
  • 168-180 Pearl Street Burlington, Vermont - Burlington Electric
    High demand for bike parking on Pearl St but not a rack in sight so folks are hitching up to whatever they can find. Photos taken Saturday 2015-06-06 around 12:30 all from the same location. Given the high pedestrian volumes through here an on street bike corral is likely an ideal solution.