Pinellas/Brighton Bay

Open Issues: 0 Closed Issues: 134 Acknowledged Issues: 8
Watching issues created after: 2017-06-06

Notified About

  • Pothole Archived
    10700-10784 Brighton Bay Boulevard Northeast Saint Petersburg, FL - St. Petersburg
    Large pothole in northwest part of roundabout on Brighton Blvd NE north of Gandy
  • 10701-10763 Brighton Bay Boulevard Northeast Saint Petersburg, Florida - St. Petersburg
    When entering Brighton Bay Blvd from Gandy, there are 2 lanes that merge into one within a short distance. The right lane is the lane that ends and must merge. However more and more lately, the cars in that lane are either unaware or unwilling to obey the fact that their lane ends and they must yield and merge. Myself and other cars driving rightfully in the left lane, have nearly been sideswiped by cars not yielding and merging properly. There is only 1 merge sign which is placed at the point where the lane ends - too late for any cars to see and act upon. Could we also get lane arrows/markings in the right hand lane to clearly indicate that is the lane that is ending and they need to merge over to the left?
  • Black Lion Drive Northeast Saint Petersburg, FL - Brighton Bay
    INTERNAL REQUEST- PLEASE @#$% BLACK LION DR NE AT VALLANCE WAY NE FOR POTHOLES AND DEPRESSIONS. REPAIR AS NEEDED
  • Pothole Archived
    10700 Brighton Bay Boulevard Northeast Saint Petersburg, FL - St. Petersburg
    THERE IS ONE VERY LARGE POTHOLE IN THE ROUND A BOUT THAT NEEDS TO BE FILLED AND BOTH IN AND OUT OF THE ROUD ABOUT NEEDS TO BE ASSESED FOR ASPHALT REPAIRS. PLEASE FORWARD TO ENGINEERING FOR REVIEW IF NEEDED
  • Pothole Archived
    10700-10784 Brighton Bay Boulevard Northeast Saint Petersburg, Florida - St. Petersburg
    Large Pot hole Sink hole - opened after rain in June. This is affecting traffic.
  • 10570 Gandy Blvd N St. Petersburg, FL 33702, USA - St. Petersburg
    Peridot Palms apartments (new construction) built their downspout drain system to flood the walking/biking trail. Their system dumps collected rainwater onto a 2' wide grass strip that floods the trail with mud and lacks adequate drainage, leaving the trail slippery and disgusting days after rains have otherwise dried up.
  • 10980 Oak St Ne St, Saint Petersburg, Florida - St. Petersburg
    Can you please provide some information about the Oak St NE paving project- (off Gandy Blvd) it has been ongoing for 2 1/2 months and the road is nearly impossible - and very progress is made to reconstruct this 1/8 of mile- I invite you to drive your car down this road. Please advise the few hundred of us that HAVE TO use this road-there is no other option to get onto Gandy Blvd. PLEASE!! 10980 Oak St NE, St. Petersburg, FL 33716
  • Pothole Archived
    10765-10803 Brighton Bay Boulevard Northeast Saint Petersburg, Florida - St. Petersburg
  • Pothole Archived
    10731-10911 Brighton Bay Blvd Ne St. Petersburg, FL 33716, USA - St. Petersburg
    The entryway to Brighton Bay on Brighton Bay Blvd NE is in need of re-paving. There are holes in the road all the way from Gandy Bkvd to the roundabout.
  • Traffic Issue Archived
    9889-9899 4th Street North Saint Petersburg, Florida - St. Petersburg
    There needs to be a no U-Turn sign at this intersection... southbound 4th at 99th Ave N. Just about daily I see someone attempting to make a U-Turn to back Northbound on 4th St. There is no southbound turn lane so they end up blocking the left hand traffic lane while waiting. I have seen this numerous times especially during evening rush hour and creates a very dangerous situation.
  • Traffic Issue Acknowledged
    10111 South Frontage Road Saint Petersburg, Florida - St. Petersburg
    I have serious safety concerns and wonder what the reasoning was for the merging ramp from 4th Street North onto Gandy Blvd. directly in front of the Life Storage facility. They have placed a 2-3 foot wide lane divider-curb what seems very close to the point where the two streets merge. Coming off 4th Street there is a 1000 foot curve and then one has to look almost directly back to see the oncoming (40 mph) traffic and merge in. 400 feet later they have placed the curb/lane divider. That then extends another 1,000 feet to the right hand turn into Vantage Point Condominiums. Looking backward to see the traffic openings and accelerating up to 40 mph it is very little time to react to the curb. Since it is not painted in any way and blends into the street I am concerned that people may not see it and either end up straddled over it, or just slam a wheel into it and cause an accident. Why wouldn’t the DOT start the divider another 300 feet down the road to allow a reasonable transition onto Gandy. That would still leave over 700 feet for the turn lane to be isolated from the main road. Please see the attached .pdf showing the area.
    Thank you for your time,
    James Yoachim
    407-468-7395
  • 10700 Brighton Bay Boulevard Northeast Saint Petersburg, FL - St. Petersburg
    PLEASE INSPECT THE ROUND-ABOUT ON BRIGHTON BAY BLVD FOR RE-PAVEMENT. POTHOLES ARE BEING FILLED A COUPLE TIMES A MONTH.