Descrizione
Citizen left voicemail requesting that BDOT repair 60th street south to 63rd street south, Crosses with 5 ave South & Antwerp Ave to 6th ave South. Citizen states the road is really bumpy and she has torn up 2 tires on that rd.
ha chiesto inoltre...
D. Does entire street need resurfacing or one block?
R. Entire street
R. Entire street
10 Commentos
Birmingham, AL (Ufficialità verificata)
BDOT_DAG (Ufficialità verificata)
Thanks for reporting this request. We look to resolve it soon.
Inspected 8.24.2023
Riconosciuto BDOT_DAG (Ufficialità verificata)
Thanks for reporting this request. We look to resolve it soon.
BDOT_DAG (Ufficialità verificata)
BDOT_DAG (Ufficialità verificata)
BDOT_DAG (Ufficialità verificata)
BDOT_DAG (Ufficialità verificata)
BDOT_KBW (Ufficialità verificata)
BDOT_KBW (Ufficialità verificata)
BDOT_KBW (Ufficialità verificata)
Your street has been included in our next street resurfacing package. You will receive notices from the contractor as your street's scheduled paving date is finalized. To see what else is being resurfaced this year, go to https://www.birminghamal.gov/transportation/bdot-street-maintenance/.
Resurfacing 5th Ave S from 61st St to Antwerp Ave
Thanks for helping to make Birmingham great.