Malden Local Notifications PLUS

Offene Fälle: 164 Geschlossene Fälle: 384 Anerkannte Fälle: 48
  • 127 Wyoming Avenue Malden, MA, 02148, USA - Malden Ward 3
    When the sidewalk and the handicap ramp were replaced on the corner of Wyoming Ave and Dutton St. the mortar in the wall of 129 Wyoming Ave. was cracked and some of it crumbled from the wall. Would it be possible for the city of repair this small section?
  • 150 Central Avenue Malden, Massachusetts, 02148 - Malden Ward 8
    Hello
    I am a resident of Malden and i have a concern to report.
    The side walk on both sides of the road between 150 to 168 Central Avenue has eventually disappeared/destroyed over the time i believe (because indeed there is a side walk before and after this patch). There is a very busy day care at 180 Central Avenue (Sophia's Day care) and me and many other parents who live in the neighborhood walk by and drop the kids. The road is a steep uphill and in addition to it, it also doesn't have a sidewalk which makes it really scary to walk with the kids. I request city to please look into this matter and help out parents like me. Thanks. Hoping to see a proper sidewalk in future.
  • Paving Öffnen
    31 Auburn Ct Malden, Massachusetts, 02148 - Malden Ward 3
    I was told my street was going to be paved this summer because it is being seriously neglected. I wanted an update please. Thanks!
  • OtherÖffnen
    29–45 Garden St Malden MA 02148, United States - Malden Ward 6
    Crosswalk spray painted going across Garden Street at Columbia St needs to be painted
  • 187–199 Madison St Malden MA 02148, United States - Malden Ward 1
    Intersection of Medford St and Madison St is only 3 seconds long. Causing severe backups.
  • OtherAnerkannt
    26 Oliver St Malden MA 02148, United States - Malden Ward 8
    Lynn Street from Rte 1 to Everett is in dire need of repair
  • 901 Main St Malden 02148, United States - Malden Ward 5
    Please have the asphalt replaced with cement.
  • 929 Main St Malden 02148, United States - Malden Ward 5
    Please have asphalt panel replaced with concrete.
  • PotholeÖffnen
    193-251 Hawthorne St Malden, MA, 02148, USA - Malden Ward 3
    The street and sidewalks were opened up in April 2023 to replace lead water piping. They were temporarily patched but the company never returned to mill and overlay the entire road as the contractor said they would. With the freeze/thaw of winter, the street crumbling and forming potholes. Some of the granite curbs were also left askew and misaligned leaving potential for car damage issues when parking. There has been a lot of media coverage of the state approving $200M for reconstruction and maintenance of municipal roads so this would be a great place to apply a little bit of that.
  • OtherÖffnen
    Taylor St Malden, Massachusetts, 02148 - Malden Ward 7
    street was paved a few years ago and they left a lip of 4 inches from taylor st to cooper ct and it is ruining the lone residents vehicle (RL)
  • PotholeÖffnen
    21 Hillside Avenue Malden, Massachusetts, 02148 - Malden Ward 1
    This is a general request for the city of malden to repave all of Hillside Ave and Hillside Ter. This summer, At least 4 months of heavy duty construction work to replace a water main has left the steep hill a very uneven and hazardous zone. No final paving was ever completed, just a mix of patchwork pours. Please help us make our community safer.
  • 24 Chestnut Street Malden, Massachusetts, 02148 - Malden Ward 3
    Sidewalk still has big holes - not repaired