Deskripsyon
Morgan was repaved MONTHs ago, and still hasn't had lane striping, no parking driveway striping & lettering done.
This is now the 3rd or 4th time reporting this.
Another month has passed since the last report.
NOTHING has been done.
ay nagtanong din...
T. Please select the issue:
S. 3. Traffic: Roadway Striping Maintenance (For all requests to refresh faded roadway striping, including crosswalks, double yellow centerlines, stop bars and markings, lane arrows, etc. Requests are typically addressed within 3 to 6 months.
S. 3. Traffic: Roadway Striping Maintenance (For all requests to refresh faded roadway striping, including crosswalks, double yellow centerlines, stop bars and markings, lane arrows, etc. Requests are typically addressed within 3 to 6 months.
6 Komentos
Jersey City, NJ (Beripikadong Opisiyal)
RacerX (Rehistradong User)
RacerX (Rehistradong User)
Nothing has been done.
Engineering - Althea (Beripikadong Opisiyal)
RacerX (Rehistradong User)
Isinara Engineering - Althea (Beripikadong Opisiyal)