الوصف
Soil stabilization measures have not been installed by Developer. A graded construction site should have straw, seed, silt fencing, or other temporary stabilization measures so that soil/debris doesn't make a mess of streets and clog stormwater drains.
سئل أيضا...
Q. What type of issue is this?
A. Erosion Issue
A. Erosion Issue
Q. Please select the type of drainage issue, if erosion use N/A.
A. Erosion issue, N/A
A. Erosion issue, N/A
2 تعليقs
City of Huntsville (Huntsville Connect) (تم التحقق رسميا)
تم إقراره Huntsville Engineering (تم التحقق رسميا)
Thank you for contacting the City of Huntsville with your service request. Your inquiry is being processed, and our department will respond as soon as possible.
Thank you,
The Huntsville Connect Customer Service Team