说明
Silt from construction site impeads drainage on adjoining property.
还问了...
问 Describe issue
答 When it rains water does not drain and floods rear of property at 902. Water reaches house. New construction back filled rear drainage easement and silt fills side yard and construction has stopped for months.
答 When it rains water does not drain and floods rear of property at 902. Water reaches house. New construction back filled rear drainage easement and silt fills side yard and construction has stopped for months.
3 评论s
William A. Cronin (注册用户)
M. Calhoun (官方验证)
已确认 M. Calhoun (官方验证)