Beschreibung
This entire cul-de-sac needs to be repaved ASAP. Covered in potholes
auch gefragt...
F. Location Description (Please provide a specific street address OR street and cross-street)
A. This entire cul-de-sac needs to be repaved ASAP. Covered in potholes
A. This entire cul-de-sac needs to be repaved ASAP. Covered in potholes
F. Direction of Travel
A. E
A. E
F. Lane (curb, inside, fast, ...)
A. all
A. all
F. # of Potholes (Approx.)
A. 11 or more
A. 11 or more
3 Kommentierens
Anerkannt City of Tucson (Verifizierter Beamter)
City of Tucson (Verifizierter Beamter)
Many neighborhoods in the initial project list are now beginning construction with additional neighborhoods scheduled to begin later this winter and spring; however, Hampton Pl (or project in Phase 1) have not been scheduled at this time. Tucson Department of Transportation & Mobility (DTM) staff are working on the schedule of improvements while ensuring our work does not conflict with scheduled utility work.
DTM will notify residents before roadway improvement are scheduled to begin in their neighborhood. The overall 10-year schedule will be divided into three phases of neighborhood projects.
Additional information on the Tucson Delivers: Better Streets | Safe Streets Program can be found online at:
https://tucsondelivers.tucsonaz.gov/pages/better-streets-safe-streets.
Geschlossen City of Tucson (Verifizierter Beamter)