الوصف
Part of the street was repaved several weeks ago, but the job was never finished. There is a large dropoff onto unpaved roadway when you travel South on 3rd St and try to cross Main St.
مراسل صحفي
Part of the street was repaved several weeks ago, but the job was never finished. There is a large dropoff onto unpaved roadway when you travel South on 3rd St and try to cross Main St.
9 تعليقs
تم إقراره RVA: Customer campaigner (مستخدم مسجل)
مغلق City of Richmond System (مستخدم مسجل)
City of Richmond System (مستخدم مسجل)
This belong to street paving not pothole crew
فتح P. Feeley (مستخدم مسجل)
تم إقراره RVA: Customer campaigner (مستخدم مسجل)
City of Richmond System (مستخدم مسجل)
City of Richmond System (مستخدم مسجل)
Who will follow up on this issue to get it fixed? The street is in worse shape now than 2 weeks ago when I first reported it.
مغلق City of Richmond System (مستخدم مسجل)
City of Richmond System (مستخدم مسجل)
This will be repave by the contractor