Description
Several large boulders strategically placed on side of flood control channel's slope have been washed away exposing the bare soil. Left alone, additional rain and channel flow will further erode channel's banks, causing further damage and possible flooding.
Flood channel's bank needs to be repaired, including boulder replacement.
2 Comments
Reopened Greg (Registered User)
Closed CLH@311 (Guest)