说明
Last week the pole at this intersection split in half. PSEG replaced the pole and moved some of the wires. The old pole is still split and leaning on wires with wires attached. This is a hazard for pedestrians.
Last week the pole at this intersection split in half. PSEG replaced the pole and moved some of the wires. The old pole is still split and leaning on wires with wires attached. This is a hazard for pedestrians.
5 评论s
Engineering - D.Stockton, Municipal Engineer (官方验证)
已确认 CRI (注册用户)
CRI (注册用户)
CRI (注册用户)
关闭 CRI (注册用户)