说明
Calloway project, Commerce side. Why would a catch basin for storm water run-off be placed next to a sanitary sewer manhole with a hole broken into the side?
Calloway project, Commerce side. Why would a catch basin for storm water run-off be placed next to a sanitary sewer manhole with a hole broken into the side?
3 评论s
Decatur Public Works - J Maximuk (注册用户)
Decatur Public Works - A Hedgebeth (官方验证)
关闭 Decatur Public Works - A Hedgebeth (官方验证)
The construction of the new storm pipe to the storm manhole was completed.