Description
Marjorie Road was one of the first street repave within the neighborhood. The sidewalks look unfinished and have gravel falling off and hanging over the side of the street. Many people had their driveway drastically changed by this as well and there is a notice break between driveway and paving from the new sidewalks. There are also no real curbs. We are all very, very thankful for the investment and newly paved street, as well as the friendly workers and police during the construction. I just feel like the Town of Braintree isn't aware of the poor construction and oddly designed sidewalk.
9 Comments
Town of Braintree <small class="fwn">(Verified Official)</small>
ellen (Registered User)
ellen (Registered User)
ellen (Registered User)
Acknowledged Dave, Highway Department (Verified Official)
Dave, Highway Department (Verified Official)
Maryellen fleming (Registered User)
Maryellen fleming (Registered User)
Closed Bob, Engineering (Registered User)