Description
The sidewalk just past 14 Fox Ridge Dr. is incomplete. Community still under developer. There is about 25 feet of grass between two sidewalks. The sidewalk needs to be installed or a ADA curb cutout completed at both end of the existing sidewalk.
5 Comments
Newnan, Georgia (Registered User)
Newnan, Georgia (Registered User)
Acknowledged City Engineer (Registered User)
JoshK0528 (Registered User)
Closed City Engineer (Registered User)