说明
Pavement edge needs to be filled in about 2' from the edge of where the road should be. Coming from driveway of 13020 Lum Crowe Rd, look left a little bit across the road.
Pavement edge needs to be filled in about 2' from the edge of where the road should be. Coming from driveway of 13020 Lum Crowe Rd, look left a little bit across the road.
3 评论s
Department of Transportation (注册用户)
已确认 Street Maintenance (注册用户)
关闭 Street Maintenance (注册用户)