The highway division does not have the equipment to seal cracks, and with the condition of the road hiring a contractor to seal cracks would not be feasible.
The Town is aware of the condition of Haynes Street. Public Works has a proposed road referendum under review, which would include full depth reconstruction of Haynes Street.
5 Commentos
Chiusa Boulette, Ken (Ufficialità verificata)
Reopened Aymee (Utente registrato)
Aymee (Utente registrato)
Riconosciuto Engineering (Ufficialità verificata)
Chiusa Kelly, Paul (Ufficialità verificata)