Description
I know this issue will be "closed" as "Issue sent to ART traffic engineering firm HDR, who is working the City’s Traffic Engineering Division on signal issues," but just want to point out all the places along the ART route that require HDR attention to include the needs of cyclists crossing Central on relatively minor streets like Edith Blvd. Please do not solely prioritize Central/ART traffic in a way that forces cyclists to break the law/use unwieldy/dangerous (on a bike) beg buttons to cross.
6 Comments
Acknowledged 311 Citizen Contact Center (Verified Official)
311 Citizen Contact Center (Verified Official)
Rob Dickson (Registered User)
Scot (Registered User)
Closed 311 Citizen Contact Center (Verified Official)
-------
"As you stated, this issue was sent to ART traffic engineering firm HDR, working the City’s Traffic Engineering Division on signal timing issues, signage and pavement markings. This included your comments about other cyclist issues in the ART corridor that require attention. They are being sent 1-2 of these each week for different issues at different locations."
-------
Scot (Registered User)