23 mile right in front of railroad tracks that entire 50 or so feet. needs more than patch work. needs black top. have had to have 1 front end aliened and now need a second. Fix this!
This is still not taken care of. That entire area was shut down for putting pipes in for two full weekends. This needs to be repaved heading west before damage is done. By putting in temporary filler is not a fix.
1 评论
一位匿名的 SeeClickFix 用户 (注册用户)