Description
Heavy equipment used during construction of new building at Erin Ridge Gate complex caused extensive damage to the grass on both sides of trail. At times the trail/path is impassible due to the mud from the damage on the sides.
Heavy equipment used during construction of new building at Erin Ridge Gate complex caused extensive damage to the grass on both sides of trail. At times the trail/path is impassible due to the mud from the damage on the sides.
4 Comments
St. Albert, AB (Spruce It Up) (Verified Official)
Public Works (Verified Official)
ADIは、 Public Works (Verified Official)
Engineering Services (Verified Official)