Opis
at the beginning of DEEPFOREST Lane right off of Pawtuckette RD, the repaving job done by the city 3 weeks ago is very,very rough and bumpy on both sides. It is about 100 ft. long and needs to be fixed in a professional manner.
Zgłaszający
at the beginning of DEEPFOREST Lane right off of Pawtuckette RD, the repaving job done by the city 3 weeks ago is very,very rough and bumpy on both sides. It is about 100 ft. long and needs to be fixed in a professional manner.
1 Skomentuj
Zamknięte Winston Lamont Wylie (Guest)