On 7/26 a crew was here to fix the end of my driveway from storm damage. At the time they felt that the storm drain and pitch of the street at the end of our driveway needed to be addressed prior to the street being repaved. Can you tell me if that will happen?
ay nagtanong din...
T. What type of issue?
S. Pothole
S. Pothole
6 Komentos
Director DPW (Beripikadong Opisiyal)
Denise Sherwood (Rehistradong User)
Roads Supervisor (Beripikadong Opisiyal)
Town Engineer (Beripikadong Opisiyal)
The work being performed by the Gas Company contractor on this street is the result of lengthy discussions/negotiations with the Town. The complete re-profiling of the roadway is beyond the scope of work at this time, however, some minor variations will be reviewed/discussed with the Company. The milling of the existing deteriorated pavement and installation of new asphalt course will result in a smoother road surface and appropriately convey storm water flows to the inlet.
We resolved this request. Thanks for helping to make Westfield a great place to live and work.