Beschreibung
Lack of sidewalks all together make it impossible to walk to downtown Natick. This is especially treacherous when you have a dog and a stroller - never mind any pedestrian that has a disability. Planning only for vehicular traffic is ignorant and short sighted. Not every person chooses to travel by car. The conditions are even more treacherous due to the lack of snow removal on what might remain of the sidewalks all down route 27.
auch gefragt...
F. Please provide a description of your inquiry related to an ongoing Natick Public Works Construction Project.
A. Pedestrian traffic needs to be planned for and accommodated down Route 27.
A. Pedestrian traffic needs to be planned for and accommodated down Route 27.
F. Please provide the location of the project (nearest roadway intersection and street address).
A. Route 27 from West Street and Rockland Street all the way to Natick Center.
A. Route 27 from West Street and Rockland Street all the way to Natick Center.
5 Kommentierens
Town of Natick, MA (Verifizierter Beamter)
SM (Registrierter Benutzer)
Town Engineer (Verifizierter Beamter)
At this time, the project has not been completed. Improved pedestrian access is part of the design from end to end of the project and will be accommodated.
The project was anticipated and scheduled to extend over two construction seasons. Not all of the areas where the former sidewalk was removed were able to be repaved during the last construction season. It is not possible to plow the sidewalks in the areas which have not been paved.
SM (Registrierter Benutzer)
Town Engineer (Verifizierter Beamter)