Beschreibung
Request new crosswalk lines be painted on street at the entrance to Maheras Gentry Park, for safer pedestrian/ bicycle travel through busy intersection.
auch gefragt...
F. Please provide cross streets and/or additional location information.
A. Conner & Clairpointe
A. Conner & Clairpointe
F. What is the nature of the problem?
A. Other
A. Other
F. If you selected "Other" above, please describe.
A. Crosswalk lines.
A. Crosswalk lines.
F. What type of sign are you reporting?
A. Other
A. Other
F. If you selected "Other' above, please specify.
A. Keine Antwort gegeben
A. Keine Antwort gegeben
F. Are you reporting a sign that is blocking access to the street, sidewalk, or blocking property access?
A. No
A. No
F. Is the street sign pole in cement or in dirt?
A. Cement
A. Cement
3 Kommentierens
DPW Street Sign Division - MG (Verifizierter Beamter)
Anerkannt City of Detroit Traffic Engineering - Meena (Verifizierter Beamter)
City of Detroit Traffic Engineering - Meena (Verifizierter Beamter)
The pavement markings (stop bar and crosswalk lines) will be redone part of the 2021 project and are expected to be in place in late summer or fall of 2021.
Thank you for your concern in traffic matters.