说明
They need to stop patching the potholes on Columbia ave and pave the entire ave. Especially at the end of the bridge were it's the worst part.
They need to stop patching the potholes on Columbia ave and pave the entire ave. Especially at the end of the bridge were it's the worst part.
4 评论s
City of Hammond (官方验证)
Public Works 2 (注册用户)
已确认 Engineering Department (官方验证)
We are working on repaving Columbia from the express way to 169th roughly. I do not have a date currently but this is on our radar.
Thank you.
Engineering Department (官方验证)