Crosswalk/sidewalk plowing

  • Maple St & S Prospect St Burlington, VT, 05401, USA - Burlington Electric
    I walk through this intersection daily during the morning and evening commute. It’s a free for all and often tricky to cross. Please repaint the faded crosswalk stripes as soon as possible, and please consider some additional traffic calming measures in the future. Thanks!
  • 112 Adams St Burlington, VT, 05401, USA - Burlington Electric
    Missed recycling pickup on Wednesday on upper Adams Street. Thanks!
  • 112 Adams St Burlington, VT, 05401, USA - Burlington Electric
    We have leaf bags waiting on the curb when your team is able to get to them ... between the storms! Thank you!
  • 193-217 S Union St Burlington, VT, 05401, USA - Burlington Electric
    I am very concerned about the safety of children walking and biking to school at the intersection of South Union and Maple during ongoing construction. Crews are starting work and actively working at this intersection while kids are crossing between 7:30-8 am. The crossing guard is at times overwhelmed managing local traffic construction and kids and sight lines are obscured. Pedestrians are forced to walk in the street right now making it doubly dangerous. The kids do not realize the extent of the safety issues and fly right through on their bikes. This is an accident waiting to happen. Construction crews should suspend operations while kids are crossing before and after school.