Toggle navigation
311 Mobile Apps
Info for Orgs
Sign Up
Login
Annemarie
Other
Acknowledged
34 Woodlawn Ave -
Chelsea
Street work was just complete on Woodlawn Ave. The street does not line up with the driveway openings. This is going to cause issues with snow removal. It is also a tripping hazard. There are several driveways on the street with this issue.
10/02/2019
Content Statistics
Reported
4
Closed
0
Comments
8
Following
1
Watch Areas
0
User Awards
No awards received
Report Issues on your Mobile Phone
© 2008-2024 CivicPlus. All rights reserved. -
Terms of Use
Language:
English (English)
Af-Soomaali (Somali)
Deutsch (German)
English (English)
English (Australia) (English (Australia))
English (Bahamas) (English (Bahamas))
English (South Africa) (English (South Africa))
Español (Spanish)
Français (French)
Français canadien (French Canadian)
Italiano (Italian)
Polski (Polish)
Português (Portuguese)
Portuguese (Brazil) (Portuguese (Brazil))
Pyccĸий (Russian)
Suomi (Finnish)
Svenska (Swedish)
Tagalog (Tagalog)
Tiếng việt (Vietnamese)
العربية (Arabic)
Ελληνικά (Greek)
日本語 (Japanese)
简体中文 (Chinese (Simplified))
繁體中文 (Chinese (Traditional))
Please include the following:
Whether this content is spam, contains foul language, or something else.