Toggle navigation
311 Mobile Apps
Info for Orgs
التسجيل
تسجيل الدخول
Annemarie
Other
تم إقراره
34 Woodlawn Ave -
Chelsea
Street work was just complete on Woodlawn Ave. The street does not line up with the driveway openings. This is going to cause issues with snow removal. It is also a tripping hazard. There are several driveways on the street with this issue.
02-10-2019
الاحصائيات المحتوى
ذكرت
4
مغلق
0
تعليقات
8
بعد
1
مشاهدة المناطق
0
جوائز المستخدم
No awards received
Report Issues on your Mobile Phone
© 2008-2024 SeeClickFix, Inc. All rights reserved. -
شروط الاستخدام
لغة:
العربية (Arabic)
Af-Soomaali (Somali)
Deutsch (German)
English (English)
English (Australia) (English (Australia))
English (Bahamas) (English (Bahamas))
English (South Africa) (English (South Africa))
Español (Spanish)
Français (French)
Français canadien (French Canadian)
Italiano (Italian)
Polski (Polish)
Português (Portuguese)
Portuguese (Brazil) (Portuguese (Brazil))
Pyccĸий (Russian)
Suomi (Finnish)
Svenska (Swedish)
Tagalog (Tagalog)
Tiếng việt (Vietnamese)
العربية (Arabic)
Ελληνικά (Greek)
日本語 (Japanese)
简体中文 (Chinese (Simplified))
繁體中文 (Chinese (Traditional))
يرجى تشمل ما يلي:
ما إذا كان هذا المحتوى غير المرغوب فيه، ويحتوي على اللغة البذيئة، أو أي شيء آخر.