Malden Local Notifications PLUS
Mga Bukas na Isyu: 163
Mga Saradong Isyu: 383
Mga Na-acknowledge na Isy: 46
-
OtherBuksan298 Medford St Malden MA 02148, United States - Malden Ward 2When will the street be paved?
-
759 Highland Avenue Malden, Massachusetts, 02148 - Malden Ward 3Contractor working on sidewalks entered our property and placed plastic debris from metal curb cuts into our trash container. Please have them come back and remove the trash/plastic they where not authorized to put in our container and did not bag properly. Thanks
-
Sidewalk or Curb RepairBuksan8 Murray Hill Road Malden, Massachusetts, 02148 - Malden Ward 3
The retaining wall of my property at 8 Murray Hill Road has become significantly damaged during the road work and sidewalk work occurring over the past 2 months. The major cracks were not present prior to the jack hammering and construction activities and require repair.
I've received a quote for the repairs, totaling $10,000. Photographs from before the construction began show that the wall did not have these significant cracks (see attached photograph).
-
Centre St & Commercial St Malden, MA, 02148, USA - Malden Ward 1No lane lines. Took almost a month to pave a tiny strip of road that should have been a single day project. Now who knows when lane lines will be added.
-
Parking / Traffic SignsKinilala40 Claremont St Malden MA 02148, United States - Malden Ward 8I am again curious why road work is being done in the Linden School area and as a home owner in that area I find this out due to a detour sign in front of my driveway? Could you please notify the neighborhood before having a major detour running through it all day?
-
Construction trenchesBuksanPoplar St Malden, MA, 02148, USA - Malden Ward 5Tufts Construction is replacing the water main on Poplar St. Residents were given a letter from the City Engineering Dept on July 19 stating the "during construction, trenches and other excavated areas will be backfilled and patched." This has not happened and has caused a severe dust problem in the neighborhood. The trenches have been backfilled but not patched.
We are not able to keep our windows open because of the dust from the construction. -
99–149 Forest St Malden 02148, United States - Malden Ward 5Flooding whenever there’s snow melt or rain. Is there a grading problem that needs to be fixed here?
-
Parking / Traffic SignsKinilalaClifton St & Linden Ave Malden, MA, 02148, USA - Malden Ward 4This stop sign on the intersection of Clifton and Linden Ave. heading towards Main Street is set back from the road and we have seen a number of people blow right past it. Seems like an accident waiting to happen and have heard this from a number of other Maldonians. If possible to move closer to the road it would be much more visible.
-
OtherKinilala28 Kenmore Rd Malden MA 02148, United States - Malden Ward 4Gravel has been sitting on Autumn st for a month.
-
Sidewalk or Curb RepairKinilalaHighland Ave & Pine St Malden, MA, 02148, USA - Malden Ward 3Sidewalk has sunk below street at handicap accessible entrance. Tripping hazard.
-
59 Glen Rock Avenue Malden, Massachusetts, 02148 - Malden Ward 3Glenrock Ave’s road condition is deplorable. The street has experienced heavy construction vehicles from Melrose (Brazil St) last fall and all summer to the ongoing Malden gas upgrades. It feels like a small earthquake in my house each time a truck or school bus passes by plus items are falling to the floor from the vibrations. I’m not sure how to solve this problem but would appreciate it if you could think of something.
-
941 Main St Malden, MA, 02148, USA - Malden Ward 5Concerned about the newly traced lines on main street preparing itself for street painting. The traced lines indicate that there will be a bike lane on both sides? This eliminates parking on the even side and several cuts off parking on the odd side. Parking that is absolutely needed on Main Street. Please confirm.