الوصف

Park has open holes and lots of construction unfinished. There is a metal pole sticking out of the ground on the playground and sprinkler was never turned on all summer. Spoke to someone at the pars and rec dept, I was told construction would be done by end of July. Pathways are not done paving so there is gravel everywhere. Park is a mess,

سئل أيضا...
Q. Please provide name and address of park if possible.
A. Baby pope park