说明
Pavers on Robin Road Left Asphalt debris all up and down Bydding rd. and also likely Fountain St. turning a smooth newly paved street into a bumpy mess. Pavers need to be called back to clean up the mess before bumps become permanently melded to existing surface. Also their contracts should be reviewed to insure contractors that do sloppy work as shown in the photo are not hired by the city.
3 评论s
已确认 City of Ann Arbor (官方验证)
geonaut (注册用户)
一位匿名的 SeeClickFix 用户 (注册用户)