Description
Brownlea Rd needs to be repaved. The frontage of my driveway is marked with several potholes that have been previously filled but it does not last. At the last street sweeping, all the loose particles from these potholes were swept onto my driveway. The road has deteriorated since the gas mains were installed under the street 2-3 years ago. There is also a substantial dangerous dip in the road in front of 11 Brownlea. Only a full repaving will resolve these problems.
also asked...
A. Other
8 Comments
Framingham, MA (Verified Official)
mscottf (Registered User)
I want to mention that Eversource installed the gas mains in 2016 and I was told by the Highway Admin that "the work that was done last year is not a final paving. They are scheduled to grind and overlay the whole trench in the near future." This never occurred but is very much needed.
mscottf (Registered User)
Again, why is this not assiged to a division that works on roads? Sanitation?
mscottf (Registered User)
mscottf (Registered User)
I hope that the City was finally take seriously the deterioration of Brownlea Rd and finally do the proper repaving instead of one band-ad after another.
Thank you.
Closed Sanitation Admin (Verified Official)
Reopened mscottf (Registered User)
And why is this assigned to Sanitation and not Highway?
mscottf (Registered User)