Mô tả
The pavement between these sets of tracks has crumbled and cars are rolling over almost the full height of the tracks as the approach the 5 corners.
The pavement between these sets of tracks has crumbled and cars are rolling over almost the full height of the tracks as the approach the 5 corners.
3 Bình luậns
Rick J (Chính thức đã xác nhận)
Được thừa nhận Rick J (Chính thức đã xác nhận)
We will work with the RR to patch these tracks up.
In 2016 that RR crossing will be replaced
Rick Jones
Essex Junction Public Works Superintendent
Đã đóng Amanda George (Chính thức đã xác nhận)