说明
The pavement between these sets of tracks has crumbled and cars are rolling over almost the full height of the tracks as the approach the 5 corners.
The pavement between these sets of tracks has crumbled and cars are rolling over almost the full height of the tracks as the approach the 5 corners.
3 评论s
Rick J (官方验证)
已确认 Rick J (官方验证)
We will work with the RR to patch these tracks up.
In 2016 that RR crossing will be replaced
Rick Jones
Essex Junction Public Works Superintendent
关闭 Amanda George (官方验证)