说明
Hello, the sidewalk here starts on the west side of the street at ballinger way, and then ends, and continues on the east side of the street up to 244th SW. This causes people to either jaywalk or walk on the edge of the street. There is a lot of foot traffic here, and is the main road between ballinger way and the Mountlake Terrace towncenter. It also is not wheelchair accessible.
Also, on the south end of this stretch next to Chevron, the sidewalk has lots of damage and isn't accessible for wheelchairs, strollers, skateboards, etc.
还问了...
问 Sidewalk Category
答 New Sidewalk
答 New Sidewalk
问 Specific location
答 19th Ave NE, between Ballinger Way and 244th St SW
答 19th Ave NE, between Ballinger Way and 244th St SW
问 Sidewalk Specific Issue
答 Sidewalk is damaged, there are curbs that cross a parking lot which aren't wheelchair accessible, and it doesn't extend all the way to the next crosswalk on either side of the street.
答 Sidewalk is damaged, there are curbs that cross a parking lot which aren't wheelchair accessible, and it doesn't extend all the way to the next crosswalk on either side of the street.
问 Does it pose a hazard?
答 YES
答 YES
2 评论s
已确认 City of Shoreline (官方验证)
City of Shoreline (官方验证)
Response from the Traffic Department:
19th from Ballinger Way to 205th Street is slated for new sidewalks in 2025. To learn more, visit our website at: https://www.shorelinewa.gov/government/departments/public-works/transportation-planning/sidewalks.
Kind regards,
City of Shoreline